- The crew will then discuss.
- Connect the end frames with cross braces ensuring the unit is plumb.
- Install the second row of end frames from the deck.
- The worker on the top section must utilize fall protection equipment.
- Ensure building tie-ins are installed as work progresses.
No comments:
Post a Comment