1. A scaffold shall not be subjected to loads greater than its maximum intended working load.
2. Work of a short duration from joists or similar members.
3 A qualified person shall determine the maximum intended working loads for scaffolds.
4 Work of a limited nature and of short duration when the permanent .
5 The maximum intended working load for each scaffold shall be posted.
No comments:
Post a Comment