Thursday 1 December 2016

Specific Requirements of Welded Frame and Suspended Scaffolds


  • Structure at intervals not to exceed 30 feet horizontally and 26 feet vertically.
  • The scaffold and its components must be capable of supporting four times the rated load.
  • The scaffold must be secured to the building.
  • Outriggers must be used on narrow frame type scaffolds whenever frames are stacked more than one section high.
  • Cross-braces of the proper length must be used to ensure that the scaffold will remain plumb and rigid.
  • Each worker on a scaffold more than 10 feet above a lower level must be protected from falling to that lower level.


No comments:

Post a Comment